For ES Load Cells

The connector for your cable will be located either at the 6 O’clock, 12 O’clock, 9 O’clock, or 3 O’clock position. Use this reference chart to determine which is the correct position of your connector/cable for easy ordering.

Standard ES Load Cells feature a 6 o’clock connector position

This guide is meant as a reference to help determine the location of the connectors/cables as they vary depending on the direction of the tension/force.

Need Additional Help Determining the Clock Position on Your Load Cells?